How to Install End & Outer Rim Deck Boards when using Step-Clip for Kebony

Installing the End Board

  1. Connect the last Step-Clip strip and trim the overhang of the Step-Clip strips flush with the edge of the ledger board.
  2. Rip the Kebony Deck Board to width allowing a ¼” gap between the board and the structure, then slide the grooved side of the board securely into the remaining clip. Ensure it is properly engaged in the groove of the board.
  3. Screw down the opposite edge of the board at each joist location using #8 Stainless Steel screws or the Pro Plug System for Kebony. When face-fastening, always pre-drill.

 

Installing the Outer Board

If you plan to create a picture frame design, stop and watch the “How to Install a Picture Frame with the Kebony Deck Board” video.

  1. On the outer rim joist parallel with the main boards, slide the single-grooved deck board securely into the first clip. Ensure it is properly engaged in the groove of the board.
  2. Screw down the outer edge of the board at each joist location using #8 Stainless Steel screws or the Pro Plug System for Kebony. When face-fastening, always pre-drill.

Didn’t find what you were looking for?

View all installation videos

Order a Sample The Modification Process Contact Us